Trades & Construction · case study
Subbie recovers held-back retentions with SOP-Act timing intact
Mid-sized electrical contractor, NSW, sub-tier on multiple commercial fitouts under head contractors.
Challenge
The contractor was sitting on ~$185k of overdue progress claims and held-back retentions across 6 head contractors. Two head contractors had stopped responding entirely. The legacy commercial-collections agency took 30% and didn’t understand SOP Act timing — one matter had its statutory status compromised because of a missed notice window.
Approach
Adeva Pro took over with SOP Act-aware sequencing — initial recovery within statutory timing, formal demand prepared in the right format if needed, and disputed-variation routing that sent contested amounts back for review rather than chasing them. Recovery against responsive head contractors used standard B2B AP-cycle messaging.
Result
Within 75 days, $134k of the $185k was recovered (~72%). Two head contractors paid in full after formal demand; two settled on documented payment plans; one entered administration (proof-of-debt filed); one was disputed-variation-routed to internal review and partially settled outside collections. SOP Act statutory status preserved on every claim that needed it.
Key takeaways
- SOP Act-aware sequencing protected statutory recovery rights.
- Disputed-variation routing avoided adjudication losses.
- Administration matter handled with proof-of-debt support.
- Recovery cost a fraction of what 30% commission would have been on the recovered amount.